Hr-Kirr_CSZ-Brandschutz_webseite

Dynamic development: CSZ Brandschutz GmbH founded

Dynamic development: CSZ Brandschutz GmbH founded

The CSZ Group opens a new chapter: the foundation of CSZ Brandschutz GmbH in the Munich metropolitan region. Mr. Alexander Kirr, long-time branch manager at CSZ Waldkraiburg, takes over the management of the company as managing director.
With over 20 years of experience in fire protection planning, Mr. Kirr brings extensive expertise and a clear strategic vision. His commitment to sustainable solutions and the targeted development of new market opportunities sets new standards within the CSZ group. Mr. Kirr explains: “We look to the future with great confidence and are convinced that CSZ Brandschutz GmbH will set new, strong accents.”
This approach enables CSZ to develop high-quality and protection-oriented fire protection solutions. We would like to congratulate Mr. Kirr on this promotion and look forward to continuing our successful collaboration!

CSZ-Bauphysik_Ernt-Reuter-Schulen_Frankfurt_Webseite

CSZ-Building Physics: The Ernst Reuter School in Frankfurt on the way to a modern learning environment

CSZ-Building Physics: The Ernst Reuter School in Frankfurt on the way to a modern learning environment

The Ernst Reuter School in Frankfurt’s Nordweststadt district is about to undergo extensive modernization. As an integrated comprehensive school with inclusive teaching and an upper secondary school, it urgently needs to be renovated and extended due to rising pupil numbers and new educational concepts.
CSZ was commissioned with the planning of the building physics, which includes a wide range of services: thermal building physics, building acoustics, room acoustics, sound immission, thermal insulation, sound insulation and sound immission forecasts. CSZ-Building Physics is currently in the decisive service phase 3, in which detailed planning and calculations are carried out in order to meet the highest standards.
The aim of the refurbishment and extension of the school is to adapt the buildings to modern requirements for free and flexible learning. This includes a core refurbishment in line with listed buildings as well as adaptations to current pedagogical and structural standards. There are also plans to build a new classroom wing, several halls, an indoor swimming pool and multifunctional buildings such as a canteen, assembly hall, media library, self-learning center and specialist rooms for science lessons.
It is particularly noteworthy that the school ensemble, designed by architect Franz Schuster in 1961, was listed in 2020. The school was designed from the outset as a model and experimental school and is now considered a pioneer of the comprehensive school concept.
This project, which includes the renovation and extension of the existing buildings as well as new buildings, is an outstanding example of the future-oriented development of school buildings. CSZ is proud to contribute its expertise in building physics and is grateful for the excellent cooperation. We will keep you informed of further progress.
Photo: Baufrösche • Architekten und Stadtplaner GmbH

Denkmal_Quadrat-Format

CSZ: Refurbishment of the ZEKIWA baby carriage factory in Zeitz in line with heritage requirements

CSZ: Refurbishment of the ZEKIWA baby carriage factory in Zeitz in line with heritage requirements

The former ZEKIWA factory building in Zeitz, an important testimony to industrial history and architecture, is being given a renaissance with a complete refurbishment in keeping with its listed status. After years of vacancy and damage caused by the 2013 flood, the building was not only modernized in terms of energy efficiency and accessibility, but the historical substance was also carefully harmonized with modern standards.
The energy-efficient refurbishment was planned by CSZ in close collaboration with Thoma Architekten from Zeulenroda. Particular attention was paid to the thermal measures on the building envelope. Capillary-active internal insulation was planned and implemented to meet the minimum thermal insulation requirements due to the listed façade made of hollow chamber clinker brick with plaster and terrazzo decorative elements. These measures not only ensure that the external appearance is preserved, but also that the building’s energy efficiency is improved.
In April 2024, the refurbished building was successfully handed over to the contractor, marking the beginning of the city archive’s move to its new premises. The revitalization of the ZEKIWA factory building is more than just a restoration: it preserves the cultural heritage and meets modern requirements at the same time.
Photo: Ralf Dieter Bischoff.

 
Headquarters

CSZ Consulting Engineers Inc. McFarlane Tower, Suite 1640 – 700 4th Ave SW Calgary, AB T2P 3J4, Canada


CSZ Consulting Engineers Inc. is an affiliated company of the CSZ Ingenieurconsult CORNELIUS-SCHWARZ-ZEITLER GmbH, Germany